1)  Major visual defects (IEC 61215/61646):-
  • A crack in a cell the propagation of which could remove more than 10% of that cell's area from the electrical circuit of the module
  • Broken, cracked, or torn external surfaces, including superstrates, substrates, frames and junction boxes
  • Bent or misaligned external surfaces, including superstrates, substrates, frames and junction boxes to the extent that the installation and/or operation of the module would be impaired
  • Bubbles or delaminating forming a continuous path between any part of the electrical circuit and the edge of the module
  • Loss of mechanical integrity, to the extent that the installation and/or operation of the module would be impaired
            Separately for IEC 61646
  • Visible corrosion of any of the thin film layers of the active circuitry of the module, extending over more than 10% of any cell
  • Module markings (label) are no longer attached, or the information is unreadable

2) ’Pass/fail’ criteria:-
  • the degradation of maximum output power does not exceed the prescribed limit after each test nor 8% after each test sequence
  • no sample has exhibited any open circuit during the tests
  • the insulation test requirements are met after the tests
  • there is no visual evidence of a major defects
  • specific requirements of the individual tests are met
  • the wet leakage current test requirements are met at the beginning and the end of each sequence and after the damp heat test

Conclusion from “pass/fail” tests
 CONDITION
   RESULT
1)
Two or more samples failed in test criteria
Fail
2)
One sample failed
  • If one or both of these new samples also fail
  •  If both samples pass the test sequence
Remaining  2 Start from beginning
  • Result  “Fail”
  • Result  “Pass”